Package- I . External power supply to 15 KW load to Micro Compositing Centre (MCC) at MV-02 under Malkangiri Muncipality (11 KV 3 Phase 3 Wire line using 55mm2 AAAC-2.5 Km, LT 3 Phase 4 Wire using (3x50+1x35)mm2 AB Cable -0.3 KM, 11/0.4 KV, 25 KVA DP Mounted substation-1 No. & 11 KV AB Switch with DP-2 Nos. Package- II. External power supply to 15 KW load to Micro Compositing Centre (MCC) at Sukraguda under Malkangiri Muncipality (11 KV 3 Phase 3 Wire line using 55mm2 AAAC-0.2 Km, 11/0.4 KV, 25 KVA DP Mounted substation-1 No. & 11 KV AB Switch with DP-1 No. |
|